International Symposium on Advanced Engineering Technologies, Kahramanmaraş, Turkey, 02 May 2019, pp.1048-1052, (Full Text)
With the developing technology, people's energy needs are constantly increasing. Energy transmission lines are needed to meet energy demands. However, it takes a long time for engineers to distribute energy and to draw and analyze the required project. Many studies have been done in the literature about project drawings. However, considering all these, project drawings were simplified by B-pro software and many analyzes were made. Modeling and project analysis are easier and more practical with B-Pro software. In this study, after the creation of the low-medium voltage grid projects of the Nizip- Karkamış region, it was aimed to draw up the discoveries, to create the direct list, to get the coordinates of the poles and to draw the regional projects in a short time with B-Pro software and to analyze them.